instant control. no redeploys. no delays.

Decisions shouldn't wait for your next deploy.

Control how your application behaves instantly. Block users, limit usage, and adapt behavior without touching your code. Implement in minutes. Built for production systems.

You shouldn’t need new deployments or touch code to react in production.

Yet, most systems still rely on code changes to: block abusive users, limit API usage, disable features, enforce business rules ...
Essential Control

Deny, allow, throttle

Define how requests are handled in real time.


Allow legitimate traffic, block unwanted access, or apply rate limits — instantly, without redeploying your application.

Instant Kills

Activate kill switches in seconds

Deploy changes instantly — no service restarts, no redeployments, no downtime.

Custom Conditional Logic

Adapt behavior based on runtime context

Structured, JSON-based rule definitions with dynamic when conditions for precise runtime decision-making.

What you can do with Govplane

Real-world use cases.
Applied instantly at runtime.

From blocking abusive traffic to enforcing dynamic business rules, Govplane lets you control how your system behaves in real time — without redeploying or scattering logic across your codebase.

Block traffic selectively
Limit API requests adaptively
Disable features conditionally
Stop abusive usage patterns
Enforce pricing rules dynamically
Activate emergency kill switches
Restrict access based on context
Control resource usage and limits
Block requests based on risk

and more...

Strategic Benefits

Move faster. Reduce risk.
Stay in control.

Make changes instantly — no deploy cycle

Enable product, compliance, and operations teams to act — without waiting for engineering release cycles.

Reduce production incidents

Avoid rush deployments that increase the chances of error, add technical debt and makes traceability more difficult.

Enforce rules consistently
across your system

Enforce regulatory, regional, or contractual constraints dynamically.

Centralize scattered business logic and rules

As systems grow more distributed, governance becomes more complex. Govplane centralizes and standardizes control.

Respond to issues in real time

Instant kill switches and runtime restrictions allow immediate mitigation to production issues.

Deterministic and Predictable Outcomes

Policy execution is deterministic, auditable, and version-controlled.Even under degraded conditions, your application behaves consistently and predictably.

There’s no mystery

How does it work

Define policies and rules

Create policies that describe how your application should behave.
Control access, limit usage, block risky inputs, trigger kill switches or custom actions — all using clear, structured rules.

Add conditions when needed

Go beyond static rules by defining conditions based on real-time context. Adapt behavior dynamically using inputs like user, region, usage, or risk signals.

Activate your policies

Policy activation automatically triggers their compilation into a versioned, signed bundle that is in sync with your runtime. This ensures integrity, consistency, and secure distribution to your applications.

Your application stays in sync

Your service connects to Govplane using a generally available SDK and a secure endpoint, and retrieves the latest bundle. Bundles are cached locally and updated automatically in the background with minimal overhead.

Evaluate decisions locally

Every decision is evaluated directly inside your application using the SDK and the local bundle. Simply call an evaluation function from the SDK wherever you need it. No external calls. No latency. Fully deterministic results.

Update behavior instantly

Change any policy and publish a new bundle.
Your application adapts in real time — no redeploys, no delays, no risk, almost zero overhead.

Start with Confidence

Frequently Asked Questions

Does my application depend on Govplane’s servers during runtime?

No.

All policy evaluations occur locally within your runtime environment. Your application does not require a live connection to Govplane to make decisions.
‍
If network connectivity is interrupted, your services continue to evaluate and enforce policies without disruption. Govplane is never in the critical execution path of your production traffic.

What environments is Govplane compatible with?

Govplane is designed exclusively for use in server environments.
‍
We currently offer SDKs for Node.js, Java [Beta], PHP, and Python [Beta].

Node.js -> https://www.npmjs.com/package/@govplane/runtime-sdk
Java [Beta] -> https://central.sonatype.com/artifact/com.govplane/gp-runtime-sdk/overview

More information about the available SDKs can be found here

What happens if a policy evaluation fails?

Govplane is built with deterministic fail-safe behavior.
‍
Each policy defines a default outcome in case evaluation cannot be completed. Organizations can configure whether the system should fail open or fail closed, depending on their operational or compliance requirements.

The SDK can also be configured to use a signed Safe Bundle stored in a secure location of your choice.

This ensures predictable behavior even under degraded conditions.

Is Govplane Secure?

Yes — Govplane is built with a strong, security-first architecture designed to protect both your systems and your data at every level.
‍
At its core, Govplane uses a robust security model where all policy bundles are cryptographically signed. Basic plans use HMAC-based signatures, while Pro and Enterprise plans leverage asymmetric signing compliant with FIPS 140-2 L3 standards, ensuring integrity and authenticity of every decision evaluated at runtime.

All data is protected with encryption both in transit and at rest, and communication between your services and Govplane is always secured over HTTPS.
‍
Each project operates through a dedicated, non-public endpoint, accessible only via revocable runtime keys. This ensures strict isolation between environments and prevents unauthorized access. Access can also be further restricted at the network level when needed.
‍
Govplane follows a No-PII-first approach, meaning we intentionally avoid storing personally identifiable information, reducing risk and simplifying compliance requirements.
‍
Finally, access to the platform is governed through role-based access control (RBAC), allowing teams to define precise permissions and maintain clear operational boundaries.
‍
Together, these principles ensure that Govplane delivers secure, predictable, and trustworthy governance — without compromising performance or flexibility.

Can Govplane support multi-tenant or multi-environment architectures?

Yes.
‍
Govplane is designed for distributed and multi-tenant systems.You can create multiple organisations, which in turn, if they have Pro or Enterprise plans, can have multiple associated projects. Policies and rules are scoped by project and each project has its own endpoint and access keys.
‍
This allows precise governance without duplicating logic across services.

How does Govplane handle access control?

Govplane implements role-based access control (RBAC) aligned with enterprise governance models, as well as authentication mechanisms using passwords, one-time passwords, time-based passwords, and physical security keys
‍
Organizations can assign granular permissions such as Owner, Admin, Editor, and Viewer, ensuring separation of responsibilities between engineering, operations, and compliance teams.
‍
Runtime authentication mechanisms ensure secure service-to-service communication, through private access points and keys that only allow access to runtime bundles and can be easily managed and revoked at any time.

‍

What is the performance impact of policy evaluation?

Govplane is designed for minimal latency overhead.
‍
Policy evaluations occur locally within your runtime and are optimized for deterministic execution. There is no external API call in the critical request path, eliminating network latency from the decision flow.
‍
In most implementations, evaluation adds negligible overhead compared to typical business logic execution. Governance becomes predictable and controlled — without sacrificing performance.

Can Govplane be deployed in private or controlled environments?

Yes.
‍
Govplane offers enterprise deployment options, including private or dedicated environments for organizations with strict security, regulatory, or data residency requirements.
‍
Because runtime evaluation occurs locally within your infrastructure, sensitive operational decisions remain under your control at all times.

Govplane cannot make changes to the system, nor adds access points to it. The only communication between your system and Govplane is through perdiodic calls made by the SDK to the private access point to obtain the runtime bundles.

‍
Deployment models can be aligned with your compliance and security policies.

Why not build an internal governance or policy engine?

Many organizations initially build internal rule systems or feature management frameworks. Over time, these systems tend to:

- Accumulate technical debt
- Lack proper auditability
- Create architectural coupling
- Require ongoing maintenance
- Become critical but underfunded infrastructure
‍
Govplane provides a purpose-built governance layer designed for scalability, traceability, and operational resilience — allowing your engineering teams to focus on product differentiation instead of maintaining internal control tooling.
‍
Building governance infrastructure is possible.Maintaining it at enterprise scale is the real challenge.

Pricing

Pricing built around your organization

Pricing scales with your projects and governance needs. Plans are organization-based, not per user.

‍

Try out one of the subscription plans below for 45 days or
‍get started for free →

‍

BASIC
$8/mo
Essential governance for early teams
Up to 1 user
One project
Up to 10 policies
Standard governance capabilities
Self-service setup
Signed Bundles
(HMAC 256)
Safe Bundles for Isolated Mode
Start 45-Day Trial
Start 45-Day Trial
ENTERPRISE
$250/mo
Advanced governance for critical systems*
Up to 20 users
Up to 15 projects
Up to 50 policies per project
Enhanced security features and compliance controls
Custom endpoints
Governance documents repository
Dedicated onboarding and configuration support
Signed Bundles
(FIPS 140-2 L3)
Safe Bundles for Isolated Mode
Contact Us
Contact Us
BASIC
€80/yr
Ideal for small teams and startups.
Up to 1 user
One project
Up to 10 policies
Standard governance capabilities
Self-service setup
Start 15-day Trial
Start 15-day Trial
ENTERPRISE
€2500/yr
Large teams with unlimited users.
Up to 20 users
Up to 15 projects
Up to 50 policies per project
Enhanced security features and compliance controls
Custom endpoints
Governance internal documents
Dedicated onboarding and configuration support
Start 15-day Trial
Start 15-day Trial

* Enterprise features require onboarding and configuration by a Govplane representative at the start of the 45-day trial period.

Not ready to sign up for a plan?
‍Start with the free plan →

Free forever. No credit card required.

Control Is Not a Feature. It’s Infrastructure.

Production Systems
Demand Control.

As your application grows, unmanaged runtime logic becomes operational risk.

Fragmented decision-making leads to instability
Hardcoded rules slow down change and growth
Emergency deployments increase exposure

Take a better approach.

Centralized policy management
Policy evaluation in runtime
Control in Real-time
Fine-grained access control
Predictable outcomes
Better compliance
Versioning and collaboration
Set policies. Enforce decisions. Take control.
Set policies. Enforce decisions. Take control.